Bristol's Best-Connected Neighbourhood
Getting from A to B is as easy as 1, 2, 3 at Brabazon: More connected to people and to places. Perfectly placed to explore Bristol and beyond.
GETTING TO AND FROM BRABAZON
Getting from A to B is as easy as 1, 2, 3 at Brabazon: More connected to people and to places. Perfectly placed to explore Bristol and beyond.
Trains from the new train station will reach Bristol Temple Meads in less than 15 minutes, making it a breeze to get to and from Brabazon and YTL Arena Bristol.*
Brabazon will connect into one of the UK's best active travel networks, meaning that everything from the businesses of North Bristol to the shops of the city centre are all within easy reach.*
The first of 3 new MetroBus stops will be located at Brabazon, connecting the neighbourhood to Bristol Parkway, UWE, Broadmead and the City Centre.*
Carefully considered transport routes mean that getting around from Brabazon couldn’t be easier, whether you choose to travel by train or by bus, by two feet or two wheels, or even by air.
Jump on the train to Temple Meads and be there within 15 minutes. Take the new MetroBus route to reach both of Bristol’s leading universities, or to pop to the shops on Park Street. Heading to London? Paddington is just over an hour from Bristol Parkway.
Whether you're traveling for business or pleasure, Bristol is a brilliant base. And Brabazon is perfectly placed to explore everything the city has to offer.
The M4 and M5 motorways are less than a 3-mile drive from Brabazon, while Bristol International Airport, which serves over 100 destinations worldwide - is just 15 miles away.
Subscribe to our neighbourhood newsletter today to keep up to date with the latest news from Brabazon
*Further information
The new North Filton train station received planning permission in January 2023. It’s being delivered by Network Rail and will connect Henbury to Temple Meads via Filton and Ashley Down. It is expected to be operational by 2025-6. Explore the route here.
The new m4 MetroBus route began operating in January 2023. The first of 3 new MetroBus stops will be located at Brabazon in 2024-5. Explore the route here.
New walking routes and dedicated cycle paths are expected to open in 2024 with the first sections of Brabazon Park.
Travel times are accurate at the time of publication. Source: AA Route Planner.
All dates are estimates and may be subject to planning approval.
All computer-generated images (CGIs) are indicative only and are not drawn to scale.